LOCATION: CHARCO BAYO OILFIELD
CITY: ENTRE LOMAS
PROVINCE: RIO NEGRO
EXECUTION YEAR: 1999
SUPPLY: SKIMMER TANK
CAPACITY: 550 m³
DiameTER: 11,400 mm - HEIGHT: 5,500 mm
QUANTITY: 1
BUFFER TANK
CapaciTY: 727 m³
DiameTER: 11,400 mm - HEIGHT: 7,150 mm
QUANTITY: 1
SUPPLY: DETAIL ENGINEERING / SUPPLY OF MATERIALS / prefabricaTiOn IN WORKSHOP / CONSTRUCTION ON SITE / INSIDE PAINTING / THERMAL INSULATION
LOCATION: ENTRE LOMAS OILFIELD
CITY: ENTRE LOMAS
PROVINCE: RIO NEGRO
EXECUTION YEAR: 1997
SUPPLY: TANK FOR INJECTION WATER
CAPACITY: 1,000 m³
DIAMETER: 9,000 mm - HEIGHT: 15,000 mm
QUANTITY: 1
SUPPLY: SUPPLY OF MATERIALS / PrefabricaTiOn IN WORKSHOP / CONSTRUCTION ON SITE
LOCATION: RIO NEUQUEN OILFIELD
CITY: CENTENARIO
PROVINCE: NEUQUEN
SUPPLY: TANK FOR STORAGE OF OIL
CAPACITY: 530 m³
DIAMETER: 9,500 mm - HEIGHT 7,500 mm
QUANTITY: 1
SUPPLY: TANK FOR STORAGE OF OIL (SEPARATOR TANK)
CAPACITY: 385 m³
DIAMETER: 9,500 mm - HEIGHT: 5,400 mm
QUANTITY: 2
SUPPLY: TANK FOR STORAGE OF OIL
CAPACITY: 500 m³
DIAMETER: 13,370 mm - HEIGHT: 3,600 mm
QUANTITY: 1
---------------------------------------------------------
LOCATION: PUESTO HERNANDEZ OILFIELD
CITY: RINCON DE LOS SAUCES
PROVINCE: NEUQUEN
SUPPLY: TANK FOR STORAGE OF WATER
CAPACITY: 320 m³
DIAMETER: 9,100 mm - HEIGHT 4,900 mm
QUANTITY: 1
SUPPLY: DETAIL ENGINEERING / SUPPLY OF MATERIALS / prefabricaTIOn IN WORKSHOP / CONSTRUCTION ON SITE / INSIDE AND OUTSIDE PAITING
LOCATION : PAMPA DEL CASTILLO OILFIELD
CITY: PAMPA DEL CASTILLO
PROVINCE: CHUBUT
SUPPLY : TANK FOR STORAGE OF OIL
CAPACITY: 1,000 m³
DIAMETER: 13,000 mm - HEIGHT 9,500 mm
QUANTITY: 1
TANK FOR STORAGE OF OIL (SEPARATOR TANK)
CAPACITY: 320 m³
DIAMETER: 9,100 mm - HEIGHT 3,600 mm
QUANTITY: 2
SUPPLY: DETAIL ENGINEERING / SUPPLY OF materials / prefabricaTION IN WORKSHOP / CONSTRUCTION ON SITE / INSIDE PAINTING / THERMAL INSULATION
GALLERY
CLOSE